Which constraint type should you use?

DRAG DROP You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company. You must build a new configuration model and include constraints in the model. You need to determine which constraint type to use for each...

July 28, 2020 No Comments READ MORE +

Which manufacturing solution should you use?

DRAG DROP A company plans to implement Dynamics 365 Supply Chain Management. You need to determine which manufacturing solutions to use. Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at...

July 27, 2020 No Comments READ MORE +

Which production methodology should you use?

A company makes lubricants and greases used in the automotive industry. They are planning to use Dynamics 365 Supply Chain Management to make products whose characteristics can be tracked throughout the production process and are associated with the packaged product. You need to identify which production methodology to use. Which...

July 27, 2020 No Comments READ MORE +

Where would you need to set up the following items?

DRAG DROP A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 Supply Chain Management. The system must meet the following requirements: - Schedule the batch production of products. - Plan for inventory fluctuations of ingredients that are used across different products....

July 27, 2020 No Comments READ MORE +

Which five actions should you perform in sequence?

DRAG DROP A company uses separate finished good item numbers for size variations of the same product. The company wants to minimize the number of variously-sized items that are created. You need to perform the setup to allow variants in size to the product master. Which five actions should you...

July 27, 2020 No Comments READ MORE +

What should you do?

You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar. A machine in the facility is defective and must be closed for repairs for the next two days. You need to configure the resource calendar to close the resource for...

July 27, 2020 No Comments READ MORE +

In which order should you perform the actions?

DRAG DROP A company uses Dynamics 365 Supply Chain Management for Process manufacturing. Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time. You need to set up the system. In which...

July 27, 2020 No Comments READ MORE +

What should you do?

A company produces pipe at certain fixed lengths. The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only...

July 26, 2020 No Comments READ MORE +

What type of BOM product lifecycle state should you create?

HOTSPOT A company makes engine parts used in the automotive industry. They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 Supply Chain Management to help support the Bill of Materials (BOM) product lifecycle for engineering version control. You must translate existing...

July 26, 2020 No Comments READ MORE +

Which four actions should you perform in sequence?

DRAG DROP A company manufactures automobile engines. You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines. You need to translate production...

July 26, 2020 No Comments READ MORE +