A company implements Dynamics 365 for Finance and Operations
HOTSPOT A company implements Dynamics 365 for Finance and Operations. Production orders are generated for products directly from projects. You create the following production order: Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection...
What is the consumption?
Topic 2, CASE STUDY 2 This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure...
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish
HOTSPOT You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish. You are running a production order with BOM lines that have a Flushing principle...
Which formula feature should you use?
You are responsible for product and formula maintenance for a paint manufacturer. You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately. You need to set up the formula line...
What should you do?
A manufacturer produces HDMI cables. Typically, the item is manufactured. The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number whether they make or buy the item. What should you do?A . Select route...
Which three calculation group warnings can you set up?
A company wants to account for the time to set up a machine to manufacture a new part. You need to set up the costing calculations in the system. Which three calculation group warnings can you set up? Each correct answer presents a complete solution. NOTE: Each correct selection is...
Which three actions should you perform in sequence?
DRAG DROP You are the quality assurance manager of a pharmaceuticals company. One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5% -10.5%. You need to set up the customer specific batch attribute to track percent acid for B0001. Which...
Which options should you use?
HOTSPOT You need to resolve the shop supervisor’s issue. Which options should you use? To answer, select the appropriate option in the answer area. NOTE: Each correct selection is worth one point. View AnswerAnswer:
Which two parts should be manually reported as finished?
You need to configure the system for plastic operations. Which two parts should be manually reported as finished? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.A . unmachined plastic piecesB . mold toolingC . machined plastic piecesD . excess plasticView AnswerAnswer: A,C
Which two actions should you perform?
A company produces homeopathic lotions for pain relief. The lotions use a combination of Product A and Product B. Product A is the primary ingredient. You use Product B to adjust the concentration of active ingredients in the lotion. You need to ensure that the lotion final product has a...