Which kind of production type should you implement?

A company is looking to use Dynamics 365 for Finance and Operations. The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they...

January 29, 2022 No Comments READ MORE +

Which three actions should you perform in sequence?

DRAG DROP A company uses Discreet manufacturing concepts to produce cables. The company’s production scheduler uses internal documents to track issues on in-process production orders. The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders. You...

January 28, 2022 No Comments READ MORE +

Does the solution meet the goal?

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution. After you...

January 28, 2022 No Comments READ MORE +

CORRECT TEXT

CORRECT TEXT You are a functional consultant for Contoso Entertainment System USA (USMF). You need to schedule the Material Requirements Planning (MRP) master plan to run nightly at 03:00 (UTC-8). To complete this task, sign in to Dynamics 365 portal.View AnswerAnswer: You need to configure a batch job to run...

January 28, 2022 No Comments READ MORE +

Which ingredient types should you use?

DRAG DROP A company uses Process manufacturing. You need to review formulas and how the different ingredient types impact the batch balancing process. Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or...

January 27, 2022 No Comments READ MORE +

Which four actions should you perform in sequence?

DRAG DROP You need to set up the system to calculate the overhead rates automatically for production. Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. View AnswerAnswer:

January 27, 2022 No Comments READ MORE +

CORRECT TEXT

CORRECT TEXT You are a functional consultant for Contoso Entertainment System USA (USMF). You need to create a calendar for USMF that uses factory shifts of 06:00 to 14:00 from Monday to Friday. To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing...

January 27, 2022 No Comments READ MORE +

Which option should you use?

You need to configure the bicycles’ production resource. Which option should you use?A . Exclusive capacity set to yes and enter a Batch capacity.B . Exclusive capacity set to no and infinite capacity.C . Exclusive capacity set to yes and infinite capacity.D . Exclusive capacity set to no and enter...

January 27, 2022 No Comments READ MORE +

What should you do?

A company produces pipe at certain fixed lengths. The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only...

January 26, 2022 No Comments READ MORE +

What are two possible ways to achieve this goal?

You need to configure production control parameters for liquid cleaning solution manufacturing. What are two possible ways to achieve this goal? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.A . Require an electronic signature when the formula is approved.B . Select Block editing...

January 26, 2022 No Comments READ MORE +