Exam4Training

Microsoft MO-201 Microsoft Excel Expert (Excel and Excel 2019) Online Training

Question #10

CORRECT TEXT

On the ‘’Summary’ worksheet, in cell B15, use a function to display the highest sales amount from the ‘’Total Sales’’ column.

Reveal Solution Hide Solution

Correct Answer:
Question #10

CORRECT TEXT

On the ‘’Summary’ worksheet, in cell B15, use a function to display the highest sales amount from the ‘’Total Sales’’ column.

Reveal Solution Hide Solution

Correct Answer:
Question #10

CORRECT TEXT

On the ‘’Summary’ worksheet, in cell B15, use a function to display the highest sales amount from the ‘’Total Sales’’ column.

Reveal Solution Hide Solution

Correct Answer:
Question #10

CORRECT TEXT

On the ‘’Summary’ worksheet, in cell B15, use a function to display the highest sales amount from the ‘’Total Sales’’ column.

Reveal Solution Hide Solution

Correct Answer:
Question #10

CORRECT TEXT

On the ‘’Summary’ worksheet, in cell B15, use a function to display the highest sales amount from the ‘’Total Sales’’ column.

Reveal Solution Hide Solution

Correct Answer:
Question #10

CORRECT TEXT

On the ‘’Summary’ worksheet, in cell B15, use a function to display the highest sales amount from the ‘’Total Sales’’ column.

Reveal Solution Hide Solution

Correct Answer:
Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #7

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

You work for Lucerne Publishing. You are compiling sales and royalty data for authors the company represents.

Configure Excel to disable all macros in the workbook without notification.

Reveal Solution Hide Solution

Correct Answer: Click the File tab.

Click Options.

Click Trust Center, and then click Trust Center Settings.

In the Trust Center, click Macro Settings.

Select the Disable all macros without notification option.

Click OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #14

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Plan Analysis” worksheet, modify the PivotTable to group the data by the values in the “Full Package Price” column. Group the values in steps of 100 beginning at 0 and ending at 200.

Reveal Solution Hide Solution

Correct Answer: In the PivotTable, right-click a value and select Group.

In the Grouping box, select Starting at and Ending at checkboxes, and edit the values if

needed. (0 and 200 respectively)

Under By, enter a number that specifies the interval for each group. (100)

Select OK.

Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:

Question #21

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “Sales Analysis” worksheet, insert a slicer that allows users to filter the PivotTable by “Category”. Then use the slicer to display only “Psychology” books.

The slicer size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:

Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #32

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.

The chart size and position do not matter.

Reveal Solution Hide Solution

Correct Answer:
Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Question #43

The Navigation area at the bottom of the exam panel contains the following commands.

✑ Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.

✑ Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.

✑ Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.

✑ Mark as complete. Flags the task to indicate that you feel you have completed the task.

In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.

End of the instructions.

From the “Employees” worksheet, create a macro named “Header”. Store the macro in the current workbook. Configure the macro to insert the “Sheet Name” in the left header cell of the active page and the “Page Number” in the right header cell.

Reveal Solution Hide Solution

Correct Answer: The Developer tab isn’t displayed by default, but you can add it to the ribbon.

On the File tab, go to Options > Customize Ribbon.

Under Customize the Ribbon and under Main Tabs, select the Developer check box.

Record a macro

Exit mobile version