You are configuring vendor collaboration security roles for external vendors. You manually set up a vendor contact. You need to assign the Vendor (external) role to this vendor.
Which tasks can this vendor perform?
- A . Delete any contact person that they have created.
- B . Deny or allow a contact person’s access to documents on the vendor collaboration interface that are specific to the vendor account
- C . View and modify contact person information, such as the person’s title, email address, and telephone number.
- D . View consignment inventory.
You are configuring vendor collaboration security roles for external vendors. You manually set up a vendor contact. You need to assign the Vendor (external) role to this vendor.
Which tasks can this vendor perform?
- A . Delete any contact person that they have created.
- B . Deny or allow a contact person’s access to documents on the vendor collaboration interface that are specific to the vendor account
- C . View and modify contact person information, such as the person’s title, email address, and telephone number.
- D . View consignment inventory.
You are configuring vendor collaboration security roles for external vendors. You manually set up a vendor contact. You need to assign the Vendor (external) role to this vendor.
Which tasks can this vendor perform?
- A . Delete any contact person that they have created.
- B . Deny or allow a contact person’s access to documents on the vendor collaboration interface that are specific to the vendor account
- C . View and modify contact person information, such as the person’s title, email address, and telephone number.
- D . View consignment inventory.
) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule
Does the solution meet the goal?
- A . Yes
- B . No
HOTSPOT
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to
create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Configure the catch weight of IngridientA to allow for the variances of the
concentrations received from the different vendors.
Does the solution meet the goal?
- A . Yes
- B . No
DRAG DROP
A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
You are building the Bill of materials (BOM) for a new production item.
The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?
- A . Phantom
- B . Vendor
- C . Item
- D . Pegged supply
A manufacturing company is implementing production in Dynamics 365 Supply Chain Management.
The production scheduler requires that machines not be scheduled to run concurrently when planning production. The scheduler also must be able to see the scheduling m a graphical view.
You need to configure the system to meet the requirements.
Which three options should you configure? Each answer presents a partial solution. NOTE: Each correct selection is worth one point
- A . finite capacity
- B . Capable to Promise
- C . bottleneck resource
- D . job scheduling
- E . operations scheduling
A company that makes artisan chocolate is implementing Dynamics 365 Supply Chain Management.
To safeguard the quality of its ingredients, the company limits recipe substitutions of its chocolates.
its top-selling chocolate bar must contain 20 percent sugar. The sugar can be Obtained from either cane or beet sugar depending on supply at the time of production.
The system must be able to automatically substitute the appropriate sugar items when generating production orders to meet the quality level of sugar even when the preferred concentration of cane sugar is out of stock.
You need to configure the system.
Which three components must you configure? Each correct answer presents part of the solution. NOTE: Each correct selection is worth one point.
- A . Item model group
- B . Priority
- C . BOM lines
- D . Item allocation key
- E . Plan group
- F . Formula lines