Exam4Training

Level I verification requires independent attestation that the requirements of the AIMR- PPS have been met on a(n) ________ basis.

Level I verification requires independent attestation that the requirements of the AIMR- PPS have been met on a(n) ________ basis.
A . international
B . attainable
C . nationwide
D . firmwide

Answer: D

Explanation:

This is a requirement under Level I verification procedures.

Exit mobile version