You are a system admin with a company where Aruba infrastructure, such as Controllers, ClearPass, and Airwave, have been deployed. The company has integrated an Aruba Introspect 2-RU appliance in the Network Infrastructure. Recently, you are seeing overload issues with the IntroSpect system. So, you want to add five more Compute Nodes to meet the requirements.
Is this a correct solution for adding more Compute Nodes? (With a 2-RU system, you can add a maximum 4 Compute Nodes.)
A . Yes
B . No
Answer: A
Latest HPE2-W05 Dumps Valid Version with 115 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund