Before confirming an anticipated completion date with the customer, it is MOST important to
- A . double check the floor finishes.
- B . ensure the date is not a holiday.
- C . ensure no components are backordered.
- D . create the system maintenance schedule.
Which of the following is addressed within the Needs Analysis part of the AV Design process?
- A . creating the project timeline
- B . outlining project Bill of Materials
- C . identifying key stakeholders for the project
- D . identifying functional requirements of the project
What is the MAIN difference between OLED displays and LED displays?
- A . luminosity
- B . higher brightness
- C . self-emitting light source
- D . determined screen shape
During a site survey of a facility to be upgraded or modernized, it is important to check wireless microphones that may be redeployed to ensure
- A . battery types conform to environmental concerns.
- B . polar patterns will not clash with new fabric treatments.
- C . microphones are operating on acceptable radio frequencies.
- D . antenna design will not interfere with HDBaseT signal distribution system.
When calibrating a loudspeaker system, which weight setting on the SPi. meter is used for its mdus>on of low frequency sound levels in the measurement?
- A . Weighted
- B . Weighted
- C . Weighted
- D . Weighted
A client has ordered a large LED video wall to be installed in an existing board room.
What should be the integrator’s MAIN operational concerns?
- A . power and temperature
- B . brightness and contrast
- C . aspect ratio and resolution
- D . cable management and length
Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?
- A . connected to the network
- B . in the rear projection room
- C . in a dedicated rack in the room
- D . above the projector, plugged into the serial port on the projector
Your client has requested a 50inch monitor be mounted on the south wail of this boardroom.
Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?
- A . A
- B . B.
- C . C
- D . D
What is the name for a written, non-technical narrative that explains system functionality?
- A . needs analysis
- B . program report
- C . service manual
- D . performance verification
Knowledge of the overall room function as envisioned by the client provides a
- A . budget range for the project.
- B . design concept to give to the architect.
- C . list of major system components for the space.
- D . starting point for determining the space AV needs.