Refer to the exhibit.
According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?
- A . Week 3
- B . Week 4
- C . Activity B
- D . Milestone X
As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?
- A . allows the AV provider to clean, service and assess equipment In the field on a regular basis
- B . allows the AV provider to check in with customer and serves as an opportunity to sell further solutions
- C . allows the AV provider to sell a service that is often forgotten by the customer, and therefore
generate greater profit - D . allows the AV provider access to client premises and scope future work
Which frequencies are amplified by a subwoofer?
- A . lowest
- B . mid-low
- C . mid-high
- D . highest
HOTSPOT
Which section of the Ohm’s Law chart should be used to calculate values expressed in Ohms? Select the answer by clicking anywhere within the correct quadrant.
When doing a site survey, it is MOST IMPORTANT to consider the client’s
- A . budget.
- B . timeline.
- C . expectations.
- D . knowledge of technology.
As the height of a character increases on a display.
- A . legibility increases.
- B . legibility decreases.
- C . brightness increases.
- D . brightness decreases.
Assuming that the speakers in the picture on the LEFT are 8 Q drivers, what is the impedance of the speaker system on the left?
- A . 2Q
- B . 4Q
- C . 8Q
- D . 16 Q
During a routine service visit, an engineer notices an LED indicator on a projector’s front panel blinking regularly.
What should be done?
- A . consult the projector’s manual
- B . replace the projector’s lamp and filters
- C . disregard because the projector is operational
- D . remove the power cable and re-boot the projector
When connecting a condenser microphone, what MUST be included in die system design for it to operate?
- A . mixer
- B . stand
- C . transmitter
- D . power source
When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?
- A . obtain the costs
- B . create the submittal
- C . schedule a site visit
- D . read the project description