You deployed a new SVM for FC access, and you used the vserver fcr, create -vserver svm1
-status-admin upcommand to enable FC service on the SVM. You then created the LIFs for the FC protocol. When you review the status of the LIFs, they show that the admin status is up, but the operational status is down. You have already verified that the ports are physically connected.
In this scenario, what is the next step to bring the LIFs up?
A . Use the network interface modifycommand to change the operational status of the LIFs.
B . Create at least one zone that contains your SVM LIF WWPNs and an initiator.
C . Verify that an FC license is applied on your system.
D . Disable the SAN switch port where your NetApp storage is connected.
Answer: B
Latest NS0-509 Dumps Valid Version with 89 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund