You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches.
In this scenario, what are two valid actions for this installation? (Choose two.)
A . Add the new nodes to the existing cluster and switches.
B. Create a new 2-node switched cluster that uses the CN1610 cluster switches.
C. Create a new 2-node switchless cluster.
D. Migrate the existing cluster to new switches and add the new nodes.
Answer: CD
Explanation:
Reference:
https://kb.netapp.com/Advice_and_Troubleshooting/Flash_Storage/AFF_Series/Controller_Hardware_Upgrade3A_Adding_AFF_A250_nodes_to_existing_cluster_report_HA_interconnect_errors_and_cannot_perform_takeover
Latest NS0-184 Dumps Valid Version with 60 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund