In the scope item SAP EWM Integration – Delivery-Based Production Integration (2VM), when are the components issued from the warehouse in the SAP EWM system?
In the scope item SAP EWM Integration – Delivery-Based Production Integration (2VM), when are the components issued from the warehouse in the SAP EWM system?
A . When the production operator confirms the operation that consumes the components
B. When the warehouse worker confirms the outbound warehouse task
C. When the components are backflushed
D. When the status of the production order is set to technically complete ("TECO")
Answer: B
Latest C_S4CWM_2308 Dumps Valid Version with 111 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments