In the preliminary analysis of the cutover project, which of the following aspects should be considered? (Multiple Choice)
A . Necessity
B . Feasibility
C . Risk
D . Cost
Answer: ABC
In the preliminary analysis of the cutover project, which of the following aspects should be considered? (Multiple Choice)
A . Necessity
B . Feasibility
C . Risk
D . Cost
Answer: ABC