In eXtreme Programming (XP), analysis, design, coding, and testing phases are done:
A . At the beginning of the iteration.
B . Every day.
C . In sequence.
D . Without documentation.
Answer: B
Latest PMI-ACP Dumps Valid Version with 717 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund