A project is on day 3 of a step with a designated wait time of 5 days. The engagement studio program is then paused for 1 day and restarted.
If the wait time for the step remain at 5 days, what day of the designated 5 days of wait time would the prospect be on when the program is restarted?
A . Day 4
B . Day 3
C . Day 0
D . Day 5
Answer: B
Latest PDX-101 Dumps Valid Version with 202 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund