On an EMC Avamar server, the maintenance schedule is enabled.
If the server is over a certain capacity, when will the server automatically cancel backups that are running under the default configuration?
A . At the start of the blackout window
B . At the start of the maintenance window
C . After the first checkpoint in the blackout window
D . After the backup has fully completed
Answer: A
Latest E20-598 Dumps Valid Version with 237 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund