Exam4Training

If the probability and consequence combination (risk) is high enough to be unacceptable, then

If the probability and consequence combination (risk) is high enough to be unacceptable, then
A . A mitigation action to predict or prevent the eventis recommended.
B . A mitigation action to predict or prevent the event isnot recommended
C . Warrant to analyze risks involved

Answer: A

Latest API-580 Dumps Valid Version with 140 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Exit mobile version