IF all the nodes are in the SLM reporting nodes list, how many paths per LUN should the customer expect when simulating a node failure by powering off Node 04?
Exhibit.
A customer is testing a dual-fabric FC SAN configuration as shown in the exhibit.
The zones are implemented on the switches shown below.
Switch 1 /Zone 1: HBA 0, LIF_1, LIF_3, LIF_5, and LIF_7
Switch 2 /Zone 2: HBA 1, LIF_2, LIF_1, LIF_6, and LIF_8
IF all the nodes are in the SLM reporting nodes list, how many paths per LUN should the customer expect when simulating a node failure by powering off Node 04?
A . 4 paths
B.6 paths
C.8 paths
D.2 paths
Answer: C
Latest NS0-520 Dumps Valid Version with 334 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments