Where can this be done?
A dispatcher needs to know the available staff for any given day. Laborers must track vacation time for the dispatcher to use. Where can this be done?A . Define Person Availability in the People applicationB . Modify Person Availability in the People applicationC . Define Person Availability in the Calendars...
Which of the following settings values will determine the number of items to be ordered during the reorder process?
Which of the following settings values will determine the number of items to be ordered during the reorder process?A . Safety StockB . Reorder PointC . Conversion FactorD . Economic Order QuantityView AnswerAnswer: B Explanation: Reference: ftp://ftp.software.ibm.com/software/iea/content/com.ibm.iea.mam/mam/7.5/ sysappmanagement/mam_7_5_reorder_calc.pdf
How can that be achieved?
A company has assets at multiple locations that require maintenance. There is a requirement to have a single work order with charges rolled up to a single GL account. How can that be achieved?A . Create a task work order for each asset.B . Create a child work order for...
How can this be accomplished?
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?A . Create a master PM and link to the characteristic on the Related Records tab.B . Create a condition monitoring point and specify the PM on the upper or lower limit.C ....
How can the meter readings be corrected?
Incorrect meter readings have been taken for gauge meters and characteristic meters. The system administrator has been asked to correct the mistake. How can the meter readings be corrected?A . Add a new meter reading in the Assets application.B . Add the correct meter readings in the Meters application.C ....
How can this be accomplished?
A company wishes to group its location records into a hierarchy to assist users in searching for assets. How can this be accomplished?A . Location Groups can be created and LIVE locations added.B . Locations can be linked by using the Related Records tab in the Locations application.C . Location...
What reservation type should be used?
A maintenance planner is in the process of planning time sensitive emergency maintenance work orders for a number of assets where items need to be reserved. What reservation type should be used?A . SoftB . HardC . UrgentD . CriticalView AnswerAnswer: B Explanation: Reference: http://www-01.ibm.com/support/docview.wss?uid=swg21580188
Which of the following actions would be used?
A company has a requirement to temporarily give a user the privilege to run the application's manual status change actions and specify this in a workflow process. Which of the following actions would be used?A . PVSTATUS and NOSTATUSB . OKSTATUS and PVSTATUSC . NOSTATUS and OKSTATUSD . PVSTATUS, NONSTATUS...
Where can these values be configured?
A company is using Process Flow Control and wants to change the default values for Flow Start and Flow Complete statuses. Where can these values be configured?A . System PropertiesB . Work Type settingsC . WOSTATUS DomainD . Change Work Order Options actionView AnswerAnswer: B Explanation: Reference: http://www.ibm.com/support/knowledgecenter/SSZRHJ/com.ibm.mbs.doc/mbs_common/ c_wo_status.html
How would this be reflected on the Actuals Tab of the Work Order?
The planner identified that the pump required four widgets as material on the work plan. An electrician was issued a quantity of four widgets from the storeroom and was able to complete the work using only two of the four widgets. The two unused widgets were recorded as returned. How...