Maintenance is required on an asset at every 6,000 miles that uses job plan JP6K, and there is an additional Job Plan, JP18K, that is used at every 18,000 miles. This Meter-Based Frequency PM has a frequency of 6,000 miles.
What are the correct sequence values to use on the Job Plan Sequence tab?
- A . JP6K = 1 JP18K = 2
- B . JP6K = 1 JP18K = 3
- C . JP6K = 0 JP18K = 3
- D . JP6K = 6 JP18K = 18
What is the reason to specify asset relationships?
- A . To deploy assets.
- B . To design the asset infrastructure.
- C . To define a logical connection between separate assets.
- D . To define how assets are allowed to behave when work is performed on them.
A company requires that laborers record the actual time they spent on a work order. The labor hours recorded are not automatically approved and the company does not want the laborer to have access to the Work Order Tracking application.
Which application would the laborers use?
- A . Invoicing
- B . Time Sheets
- C . Labor Reporting
- D . Activities and Tasks
A planner needs to combine a number of items to be used regularly that can be tracked by a single item number and issued to work orders.
How can this be achieved?
- A . Using an item assembly structure.
- B . Transferring the necessary items to a single bin.
- C . Changing the item number of each included item.
- D . Updating the physical count of the inventory record.
The maintenance supervisor is gathering data to use to build job plans. Only certain job plan will be carried over to the work orders based on the conditions applied.
What data can have conditions?
- A . Services, Tools, Assets
- B . Labor, Tasks, Calendars
- C . Labor, Services, Materials
- D . Materials, Specifications, Tools
A forecast has been made for a PM. The decision has been made to delete that forecast.
In which case is the forecast blocked from being deleted?
- A . A reforecast is pending.
- B . The forecast dates are unlocked.
- C . A forecast can always be deleted.
- D . The forecast dates have been locked.
An administrator has a requirement to update the address of all company records associated with a certain vendor.
How can this be achieved?
- A . Update the company set with the new address.
- B . Update the vendor record and select Update Related Vendors?.
- C . Update the company template and check the checkbox Roll Down?.
- D . Update the company master record and check the checkbox Update Related Companies?.
A company wants to trigger a PM based on a characteristic type meter.
How can this be accomplished?
- A . Create a master PM and link to the characteristic on the Related Records tab.
- B . Create a condition monitoring point and specify the PM on the upper or lower limit.
- C . Create a PM against the asset and specify the meter on the Frequency tab of the PM.
- D . Create an escalation based on the characteristic meter and trigger the PM via an action.
A store manager needs to make changes to an asset via the Move/Modify action.
Which of the following changes can be made? (Choose two.)
- A . Features
- B . Storeroom
- C . Asset’s location
- D . Class description
- E . Parent/child relationship
A company is using Process Flow Control and wants to change the default values for Flow Start and Flow Complete statuses.
Where can these values be configured?
- A . System Properties
- B . Work Type settings
- C . WOSTATUS Domain
- D . Change Work Order Options action