IBM C1000-015 IBM Business Process Manager V8.6 Application Development using Process Designer Online Training
IBM C1000-015 Online Training
The questions for C1000-015 were last updated at Feb 13,2025.
- Exam Code: C1000-015
- Exam Name: IBM Business Process Manager V8.6 Application Development using Process Designer
- Certification Provider: IBM
- Latest update: Feb 13,2025
Which gateway can be used for a service flow where more than one path can be followed for a specific process instance?
- A . Event Gateway
- B . Parallel Gateway
- C . Exclusive Gateway
- D . Decision Task Gateway
In IBM BPM, what needs to be done to use an external service in a Service Flow?
- A . Use a Modify Task activity type to invoke an operation of the external service
- B . Use a Service Task activity type to invoke an operation of the external service
- C . Use a Decision activity type to invoke the rules of an external service
- D . Use a Content Integration Task activity type to invoke an operation of the external service
Which statement describes using a Service Call control from the BPM Ul toolkit to invoke a service flow?
- A . It is used to invoke a service without having to use boundary events and has an input and output variable with on load, on invoked, on result, on error events. It can be placed in client side human service coach page or inside coach view.
- B . A Service flow which has an input and output variable and a service task activity inside it calling an implementation service.
- C . It is used to invoke a service that returns the data displayed in the table, never bound to variable, with on load, on service data loaded, on service data error events. It can be placed in client side human service coach page or inside coach view.
- D . It is coupled with the human service in which it is used. It is created in the library area where User Interface library items are stored.
A loan application process has several activities. A developer noticed a Service Flow activity in that process is taking a long time to complete. That particular Service Flow implementation has a Linked Service Flow activity and few other activities in it.
What can the developer do to improve the performance of the Service Flow?
- A . Enable caching of results for the top level Service Flow.
- B . Attach a timer boundary event to the top level Service Flow.
- C . Add tracking events before and after the top level Service Flow.
- D . Assign pre-execution and post-execution scripts for the top level Service Flow.
What will happen when sequence flows evaluate to false in an inclusive gateway?
- A . The instance will never complete.
- B . The default sequence flow will be followed.
- C . A failed event will be created for the process instance.
- D . The gateway will wait for one of the sequence flows to become true.