In a Huawei disaster preparedness plan using production site deploymentwith an oracle RAC cluster, to ensure that the disaster recovery database provides normal service should the production site fail, which of the following statements is correct?
In a Huawei disaster preparedness plan using production site deploymentwith an oracle RAC cluster, to ensure that the disaster recovery database provides normal service should the production site fail, which of the following statements is correct?A . Disaster recovery end must be deployed, oracle rac cluster can not deploy oracle...
In Simpana software, incremental backup means:
In Simpana software, incremental backup means:A . The data that has changed since the last backup.B . The data that hasbeen changed since the last full backup.C . The completion of all data backup.D . After the initial backup, all data has back up.View AnswerAnswer: B
True or False, with aclient using the SMB 1.0/2.0/2.1/3.0 protocol to perform file replication inside a Huawei OceanStor 9000, it does not need to pass through the client, but can be done directly to the system.
True or False, with aclient using the SMB 1.0/2.0/2.1/3.0 protocol to perform file replication inside a Huawei OceanStor 9000, it does not need to pass through the client, but can be done directly to the system.A . TrueB . FalseView AnswerAnswer: B
When planning an OceanStore Unified Storage Array synchronization remote replication, which of the following description is correct. (Multiple choice.)
When planning an OceanStore Unified Storage Array synchronization remote replication, which of the following description is correct. (Multiple choice.)A . In the scenario where the actual RPO indicator requires zero, you can choose to synchronize remote replication.B . Synchronous remote replication can be used to map the main and secondary...
Which of the following description of these issues are correct?
An Engineer installed a OceanStor 9000 for a customer (a total of 5 OceanStor 9000 C Node, front and rear endsare 10GE TOE networking, on-site installation TOE network card). Then connected the signal lines, power lines, and debugged the software. During the installation there were issues. Which of the following...
What do you need to do to fix it?
Huawei Standard Edition N8500 has two nodes named Pubeth1 and Pubeth4. It opened the NFS service. NFS server accepts recovery after NFS guest. However, the client mount point can not be accessed into the directory for a long time without echo. What do you need to do to fix it?A...
Which client application connection method can provide the required landing User ID andpassword?
For commonly used SQL Server 2005 and 2008, users canconnect to the specified server through the SQL Server Management Studio tool Database Engine. There are two connections in the connection group authentication method. Which client application connection method can provide the required landing User ID andpassword?A . SQL Server AuthenticationB...
In a A VTL6900-I system, the backup server connected to it is the Linux operating system. The backup server and the VTL6900-I system are directly connected through the FC.
In a A VTL6900-I system, the backup server connected to it is the Linux operating system. The backup server and the VTL6900-I system are directly connected through the FC. The server identifies the device information as shown below. After the backup server is configured as a backup client for the...
Which of the following information about the InfoEqualizer function of Huawei OceanStor 9000 is correct? (Multiple choice)
Which of the following information about the InfoEqualizer function of Huawei OceanStor 9000 is correct? (Multiple choice)A . When using the InfoEqualizer function, you need to configure DNB . If you use an external DNS server, when configuring the DNS server, there is a setting of "reverse lookup zone name",...
Which of the following acceptance scenarios business should not be affected?
An active-active disaster recovery solution configuration needs to be done after the acceptance test. Which of the following acceptance scenarios business should not be affected? (Multiple choice.)A . Single VIS device failureB . Single oracle failureC . A single data center full failureD . Third-party arbitration array failureView AnswerAnswer: A,B,C,D