Which of the following does not belong to the Fusionserver pro server?

Which of the following does not belong to the Fusionserver pro server?A . OceanStor9000 B. High-density server X6000 C. Mission-critical server Kunlun D. Smart Engine FPGAView AnswerAnswer: A

July 16, 2023 No Comments READ MORE +

Which is the best process for firmware upgrade of Huawei's critical business server (KunLun Server)?

Which is the best process for firmware upgrade of Huawei's critical business server (KunLun Server)?A . Download software package -> Upgrade CMC software -> Upgrade system computing frame -> Upgrade management frame CPLD -> Upgrade cabinet LCD screen -> Upgrade RAID card -> Upgrade NIC B. Download software package ->...

July 16, 2023 No Comments READ MORE +

When transporting a rack, there should be no slope greater than () along the way.

When transporting a rack, there should be no slope greater than () along the way.A . 10 degrees B. 25 degrees C. 20 degrees D. 15 degreesView AnswerAnswer: A

July 16, 2023 No Comments READ MORE +

The configuration of the fan in the server is used for heat dissipation and power reduction. The rack server 2288 V5 has 7 hot-swappable counter-rotating fans, that is, fans in ( ) connected in series, and rotate in ( )

The configuration of the fan in the server is used for heat dissipation and power reduction. The rack server 2288 V5 has 7 hot-swappable counter-rotating fans, that is, fans in ( ) connected in series, and rotate in ( )A . 7, clockwise B. 14, counterclockwise C. 14, clockwise D....

July 16, 2023 No Comments READ MORE +

Which statement below is related to the breakthroughs at the boundaries of cluster-based servers?

Which statement below is related to the breakthroughs at the boundaries of cluster-based servers?A . L1+L2 intelligent linkage and fully liquid-cooled integrated solution for cabinets B. Simultaneously increasing the intelligent management engine with the intelligent acceleration engine C. Supports SSD, FPGA acceleration cards, intelligent converged NICs, and AI NICs/boardsView AnswerAnswer:...

July 15, 2023 No Comments READ MORE +

The company has received an HPC (High-Performance Computing) project, and Engineer A needs to select the products in the best order. Which is the correct sequence?

The company has received an HPC (High-Performance Computing) project, and Engineer A needs to select the products in the best order. Which is the correct sequence? ① Determine the overall computing capability based on research requirements; ② Select compute nodes, fat nodes, and acceleration node devices; ③ Determine OS and...

July 15, 2023 No Comments READ MORE +

Which of the following is a terminal product in the form of a developer board with the Atlas AI acceleration module as the core?

Which of the following is a terminal product in the form of a developer board with the Atlas AI acceleration module as the core?A . Atlas 300T training card B. Atlas 500 smart edge station C. Atlas 3001 reasoning card D. Atlas 200 DKView AnswerAnswer: D

July 15, 2023 No Comments READ MORE +

In the SAP HANA solution, 8^48 cores are usually configured when performing CPU compatibility for application server planning and analysis, among which the reference value calculated by SAP QUICK SIZERT (or evaluated based on project experience), and the SAPS value of 100 concurrent users is around ()

In the SAP HANA solution, 8^48 cores are usually configured when performing CPU compatibility for application server planning and analysis, among which the reference value calculated by SAP QUICK SIZERT (or evaluated based on project experience), and the SAPS value of 100 concurrent users is around ()A . 3500 B....

July 15, 2023 No Comments READ MORE +

When upgrading Huawei blade server compute nodes (such as CH121v5), which step-by-step process should be followed?

When upgrading Huawei blade server compute nodes (such as CH121v5), which step-by-step process should be followed?A . Obtain software package and upgrade guide - Log in to iBMC interface - Check alarm information - Check firmware version - Upgrade firmware - Verify after firmware upgrade B. Check alarm information -...

July 15, 2023 No Comments READ MORE +

Engineer A, during the early stage of project planning, estimates the power consumption of Huawei servers to determine the power supply for the data center. Which tool should be used?

Engineer A, during the early stage of project planning, estimates the power consumption of Huawei servers to determine the power supply for the data center. Which tool should be used?A . Huawei Server Power Consumption Calculator B. Huawei Server Compatibility Query Assistant C. Huawei Server Product Documentation D. Huawei Server...

July 14, 2023 No Comments READ MORE +