WLAN network planning in the financial industry needs to consider the planning and design of Monitor AP to enhance security.

 WLAN network planning in the financial industry needs to consider the planning and design of Monitor AP to enhance security.A . TRUEB . FALSEView AnswerAnswer: A

December 9, 2021 No Comments READ MORE +

In WLAN outdoor scenarios, how many AT815SNs can be connected to AP6510DN at most?

In WLAN outdoor scenarios, how many AT815SNs can be connected to AP6510DN at most?A . 4B . 8C . 16D . 32View AnswerAnswer: D

December 9, 2021 No Comments READ MORE +

 The transmit power of AP6310SN is 27dBm . After a two-power splitter (insertion loss 0.5dB), one port is connected to a 3dBi omnidirectional antenna, and the other port is connected to a 7dB i antenna, then the output power of the two antennas (without considering the feeder and interface loss) respectively are:

 The transmit power of AP6310SN is 27dBm . After a two-power splitter (insertion loss 0.5dB), one port is connected to a 3dBi omnidirectional antenna, and the other port is connected to a 7dB i antenna, then the output power of the two antennas (without considering the feeder and interface loss) respectively are:A . 25dBm, 32dBmB . 26.5dBm, 26.5dBmC...

December 9, 2021 No Comments READ MORE +

 For an open office area, there are 8 office areas, each office area has 10 people, each user requires a downlink bandwidth of 2Mbps , and the concurrent Internet access rate of all users is 80% . How many AP5030DNs are needed for this floor of office building ? The

 For an open office area, there are 8 office areas, each office area has 10 people, each user requires a downlink bandwidth of 2Mbps , and the concurrent Internet access rate of all users is 80% . How many AP5030DNs are needed for this floor of office building ? The measured rate ofeachAPis about80Mbps, without considering other factors such...

December 8, 2021 No Comments READ MORE +

 The life cycle of Huawei's enterprise services has 5 different stages: Plan, Design, Implement, Operate, and Improve, referred to as PDTOI .

 The life cycle of Huawei's enterprise services has 5 different stages: Plan, Design, Implement, Operate, and Improve, referred to as PDTOI .A . TRUEB . FALSEView AnswerAnswer: A

December 8, 2021 No Comments READ MORE +

In which of the following situations, the DHCP relay function must be enabled?

In which of the following situations, the DHCP relay function must be enabled?A .  When the DHCP server and terminal is not in the same VLANB .  When the DHCP server needs security protectionC .  When the terminal uses dotlx authenticationD .  When the terminal is a visitor's web portal authenticationView AnswerAnswer: A

December 7, 2021 No Comments READ MORE +

 Which of the following descriptions about using the WLAN Tester 2.0 tool to conduct site surveys is correct?

 Which of the following descriptions about using the WLAN Tester 2.0 tool to conduct site surveys is correct?A .  New project → import drawing → set scale → load network card → start → dotting → endB .  New project → import drawings → load network card → set scale → start → dotting → endC .  New project → import drawing → set scale → start → dotting → endD .  New project → set scale → import drawings → load network card → start → endView AnswerAnswer: A

December 7, 2021 No Comments READ MORE +

 Xiao Zhang is a network administrator of a hotel. One day he found that the hotel visitors could not access the network normally. After checking, he found that the visitor’s device got the wrong IP address. In order to prevent this kind of attack, which of the following technology should be used in the network?

 Xiao Zhang is a network administrator of a hotel. One day he found that the hotel visitors could not access the network normally. After checking, he found that the visitor’s device got the wrong IP address. In order to prevent this kind of attack, which of the following technology should be used...

December 7, 2021 No Comments READ MORE +

What is the default priority of VRRP?

What is the default priority of VRRP?A . 1B . 0C . 100D . 255View AnswerAnswer: C

December 7, 2021 No Comments READ MORE +

400mW=()dBm

400mW=()dBmA . 20dBmB . 23dBmC . 25dBmD . 26dBmView AnswerAnswer: D