Huawei H19-311-ENU HCSA-Presales-Digital Power Online Training
Huawei H19-311-ENU Online Training
The questions for H19-311-ENU were last updated at Nov 19,2024.
- Exam Code: H19-311-ENU
- Exam Name: HCSA-Presales-Digital Power
- Certification Provider: Huawei
- Latest update: Nov 19,2024
Is the channel type of the typical configuration of FusionModule800 a cold aisle or a hot aisle? ( )
- A . Hot and cold aisle
- B . Hot Aisle
What are the incoming line methods supported by UPS5000-A-400/500K? ( )
- A . Downstream
- B . Top entry line
- C . Compatible with upper and lower incoming lines
At which of the following voltages the lead-acid battery is already in a dangerous state ( )
- A . 1.67
- B . 2.25
- C . 2.35
- D . 2.45
Which are standard configurations in the typical configuration of FusionModule800? (
- A . Smoke sensor, door sensor, pad, water immersion, simple wiring trough, video
- B . Temperature and humidity, door sensor, pad, water flood, video, mobile APP
- C . Smoke sensor, temperature and humidity, pad, SMS alarm, mobile APP, automatic pop-up door
The NetEco6000 management system supports access to third-party equipment to achieve centralized management of the computer room; then, when monitoring which of the following equipment is connected to third-party equipment,
it is necessary to pay the RM bill and report the third-party equipment access fee? (
- A . Huawei UPS 5000E
- B . Huawei Power Supply TP48300
- C . Emerson Air Conditioning
- D . None of the above is true
In FusionModule2000, how to adapt the skylight when the column occupies the closed passage space in the scene around the column?
- A . Customized tempered glass flip skylight
- B . Field machining with control skylight
- C . On-site cutting with plexiglass adjustable skylight
- D . Sealed with special adjustable sealing plate for skylight
When the NetEco management system is sold in the market, which of the following situations does not need to submit RM to the management system RAT for decision-making? ( )
- A . When there are three-party equipment access requirements in the project.
- B . When there is non-standard function customization in the project, the existing products cannot meet it.
- C . When supporting FusionModule products for sale
- D . When large-scale DC project network management is sold separately.
Which of the following statements is false about surveillance cameras?
- A . Less than 4 cameras can be connected to the ETH socket
- B . The camera power supply mode is PoE power supply
- C . The camera can be directly connected to the switch powered by PoE
- D . Camera data can be stored through TF card or VCN500
- E . The number of cameras configured is the same as the number of control sunroofs