HP HPE0-S58 Implementing HPE Composable Infrastructure Solutions Online Training
HP HPE0-S58 Online Training
The questions for HPE0-S58 were last updated at Dec 20,2024.
- Exam Code: HPE0-S58
- Exam Name: Implementing HPE Composable Infrastructure Solutions
- Certification Provider: HP
- Latest update: Dec 20,2024
HOTSPOT
An integrator needs to validate whether the datastore created for ESXi systems based on 3PAR virtual volume can support all DRS cluster functionalities.
Click on the parameter that the integrator needs to verify.
A customer needs to significantly improve I/O performance to a database server.
Which product should an integrator implement as part of a Synergy composable solution?
- A . HPE Synergy D3940 storage module with SSD drives
- B . HPE Composer with NVMe drives
- C . HPE Synergy compute module with a Tesla accelerator
- D . HPE Synergy Image Streamer
A customer tries to revert a data volume located on the HPE 3PAR array to a specific snapshot that was taken using HPE Composer, but the process fails.
What must an integrator do to fix this problem?
- A . Install the snapshot agent on the operating system to enable online snapshot operations
- B . Select the “Force” checkbox to ignore the warning, and revert to the snapshot because this is a data volume
- C . Navigate to the SSMC and revert to the snapshot using HPE 3PAR tools
- D . Disconnect the volume from the server, then revert to the snapshot and reconnect back to the server
DRAG DROP
Match each HPE server platform with optimal workload.
A customer needs to deploy additional management components, such as vCenter Server and HPE Global Dashboard.
According to HPE best practices, how should an integrator deploy these components?
- A . Deploy VMware HA cluster on two dedicated management servers, then deploy management components to this cluster.
- B . Deploy vCenter Server as a virtual machine on the Hyper-V host and HPE Global Dashboard to the domain controller.
- C . Install vCenter Server on the domain controller, then deploy HPE Global Dashboard to the HPE Composer or HPE OneView appliance.
- D . Deploy vCenter Server to any Windows machine, and install HPE Global Dashboard on the same server.
During a first-time installation of HPE Synergy, an external monitor is not available to the integrator.
Which approach should the integrator take to perform the first-time setup?
- A . Download MSTCS, connect the laptop to the front Panel Ethernet port, and open a RDP Session to 192.168.10.1 on port 443.
- B . Download VNC Viewer, connect the laptop to the front Panel Ethernet port, and open a VNC-connection to 192.168.10.1 on port 5900.
- C . Download Telnet, connect the laptop to the front Panel Ethernet port, and open a connection to 192.168.10.1 on port 8443.
- D . Download PuTTY, connect the laptop to the front Panel Ethernet port, and open an SSH connection to 192.168.10.1 on any port (default is 22).
A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool.
How should the integrator set up the management of the datacenter?
- A . Add two frames from the remote datacenter as remote enclosures using existing Composer
- B . Install one Composer in every frame in both local and remote datacenter
- C . Deploy one Composer in each site and link them together
- D . Connect the management links with fibre cables if the distance between datacenters is more than 500m
An integrator needs to configure a set of networks for Synergy compute nodes to send data to devices outside of a Synergy frame.
How should the integrator complete the task?
- A . Add the network to an interconnect bay within a Logical Enclosure (LE)
- B . Add the networks to an uplink set within a Logical Interconnect Group (LIG)
- C . Add the networks to an Enclosure Group (EG)
- D . Add the network sets to a Logical Interconnect Group (LIG)
A customer needs to expand a single-frame Synergy solution to two frames.
What should the integrator do to establish a proper management network for the two frames?
- A . Connect the RJ-45 management ports of the Virtual Connect modules together with redundant CAT6A cables.
- B . Disconnect the existing management ring, and cable the Frame Link Modules in the first frame to the Frame Link Modules in the added frame.
- C . Connect the RJ-45 front panel connectors on the two frames together with a single CAT6A cable.
- D . In the Synergy console, select the Frame Link Modules in the new frame and define the connection between them.
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the integrator use to address the customer’s concern?
- A . Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer’s management network.
- B . Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer’s management network.
- C . Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer’s management network.
- D . Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer’s management network using two uplinks.