How should the administrator verify the incomplete job runs prior to the next scheduled backup?
An administrator has a scheduled policy that backs up 20 clients, each with multiple mount points and multiple data streams enabled. One of the jobs has failed and is in an Incomplete state in the Activity Monitor.
How should the administrator verify the incomplete job runs prior to the next scheduled backup?
A . run a manual job for the client
B. resume the job
C. run a manual job for the mount point
D. resume the parent job
Answer: B