An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.
How should the administrator perform this task?
A . Check the Disregard Existing Workloads radio button in the Runway scenario.
B . Check the Disregard Existing Nodes radio button in the Runway scenario.
C . Add up the recovered workloads and manually remove from the Runway configuration.
D . Power down the workloads during a maintenance window and run the Capacity Runway.
Answer: A
Explanation:
When forecasting infrastructure requirements for a new program in a Nutanix environment where all existing applications will be decommissioned, the most straightforward method is to disregard any workload calculations that include existing applications. This ensures that the analysis focuses solely on the needs of the new program.
Option A, "Check the Disregard Existing Workloads radio button in the Runway scenario," is the correct choice. Nutanix Runway is a tool designed to help administrators forecast and plan infrastructure requirements based on upcoming needs without being skewed by current utilizations that are scheduled to be decommissioned.
This method allows for a cleaner, more accurate projection of resources needed for the new applications, disregarding any resources currently in use that will no longer be relevant.
Reference: This approach is detailed in Nutanix planning and forecasting documentation, ensuring administrators can plan accurately for infrastructure changes and needs without the interference of outgoing workloads.