Refer to the exhibit.
A network administrator wants to create a leaf and spine topology.
How should the administrator connect the switches for the best latency and load-balancing?
A . Connect each leaf switch to each spine switch, and run a protocol such as EV
C . Connect each leaf switch to half of the spine switches, and run a protocol such as TRIL
E . Connect each leaf switch to each spine switch, and run a protocol such as TRIL
G . Connect each leaf switch to half of the spine switches, and run a protocol such as EV
Answer: C
Latest HPE0-Y53 Dumps Valid Version with 105 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund