An administrator has two clusters: Site A and Site B.
Async DR is configured between the clusters as follows:
• Site A is the Primary Site
• Site B is the Secondary inactive Site, no VMs running
• Site A is fully in Production
• Site B used as Backup/Disaster Recovery
The customer wants to perform a planned failover between the sites.
How should the administrator accomplish this?
A . Click Activate on the Secondary site within the Data Protection Dashboard
B . Click Activate on the Secondary site and run deactive NCLI command on Primary site
C . Choose Migrate on the Secondary site within the Data Protection Dashboard
D . Choose Migrate on the Primary site within the Data Protection Dashboard
Answer: D
Explanation:
Ref: https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v510:wc-protection-domain-failover-wc-t.html
Latest NCS-Core Dumps Valid Version with 191 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund