How should a Development Team deal with non-functional requirements?
A . Ensure every Increment meets them.
B . Make sure the release department understands these requirements, but it is not the Development Team’s responsibility.
C . Handle them during the Integration Sprint preceding the Release Sprint.
D . Assign them to the lead developers on the team.
Answer: A
Latest PSM I Dumps Valid Version with 197 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund