How should a Development Team deal with non-functional requirements?
A . Ensure every Increment meets them.
B . Make sure the release department understands these requirements, but it is not the Development Team’s responsibility.
C . Handle them during the Integration Sprint preceding the Release Sprint.
D . Assign them to the lead developers on the team.
Answer: A
Explanation:
The correct answer is A, because the Scrum Guide states that “the definition of ‘Done’ is a formal description of the state of the Increment when it meets the quality measures required for the product.” Therefore, non-functional requirements should be part of the definition of ‘Done’ and ensure every Increment meets them.
Latest PSM I Dumps Valid Version with 197 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund