How much of the overall working time should the Product Owner spend with the Developers?

How much of the overall working time should the Product Owner spend with the Developers?
A . At least 15% of the time.
B. As much as required.
C. Min. 50% of the time.

Answer: B

Explanation:

There is no percentage. It has to be spend as much time as needed.