Your project requires material determination in a sales order if the ordered material is NOT available.
How do you achieve this? Choose the correct answer.
A . Set up a material determination record with a suitable substitution reason.
B . Deactivate the material availability check and use material determination.
C . Set up the access sequence to perform a quantity check for the material.
D . Set up an availability check in the material determination record.
Answer: A
Latest C_TS460_1909 Dumps Valid Version with 84 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund