A director would like to have an up to date Cluster Efficiency Summary report emailed on the first of every month to keep management up to date on how the cluster is being utilized.
How could a playbook be configured to satisfy this request with the least human interaction?
A . Manual Trigger > Wait Until Day of Month > Generate Report > Email
B . Manual Trigger > Generate Report > Email
C . Report Trigger > Wait Until Day of Month > Email
D . Time Trigger > Generate Report > Email
Answer: D
Explanation:
A time trigger is a type of playbook trigger that allows the user to specify a schedule for running a playbook. This trigger is useful for automating tasks that need to be performed periodically or at a specific time. A manual trigger requires the user to initiate the playbook execution manually, which is not ideal for a recurring task. A report trigger is a type of playbook trigger that allows the user to run a playbook when a specific report is generated. However, this trigger does not guarantee that the report will be generated on the first of every month, as it depends on the report settings. A wait until day of month action is a type of playbook action that pauses the playbook execution until a specified day of the month. This action is unnecessary if the playbook already has a time trigger that specifies the desired schedule.
Reference: Nutanix Multicloud Automation Administration (NMCAA) course, Module 4: Playbooks, Lesson 4.1:
Playbook Triggers
Nutanix Certified Professional – Multicloud Automation (NCP-MCA) 6.5 Exam Blueprint Guide, Section 3.1: Create a playbook to automate IT operations using X-Play
Reference: https://portal.nutanix.com/page/documents/kbs/details?targetId=kA00e000000LU6BCAW
Latest NCP-MCA Dumps Valid Version with 75 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund