How can you control the account determination for planned delivery costs based on the condition type?
How can you control the account determination for planned delivery costs based on the condition type?
A . Assign an account key in the condition type.
B. Assign an account key in the calculation schema.
C. Assign an account key in the condition record.
D. Assign an account key in the access sequence.
Answer: B
Latest C_TS452_2021 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments