How can this be configured?

A user wishes to perform the same work tasks on several assets simultaneously.

How can this be configured?
A . A Route should be created with each stop being one Asset and the Job Plan associated with the Route record.
B. A Master Job Plan should be created with Tasks for each Asset.
C. A Work Order Hierarchy should be created against the same Job Plan used for all stops.
D. The Assets should be specified on the Multiple Assets, Locations and CIs table on the Work Order.

Answer: A

Explanation:

To perform the same work tasks on several assets simultaneously, a route can be created in the Routes application. A route is a series of work orders that are generated in a specific sequence to maintain a group of assets. Each stop in the route can be associated with a specific asset, and the job plan can be assigned to the route record, which means the same job plan tasks can be performed on each asset.