Exam4Training

How can this be accomplished?

A company wants to trigger a PM based on a characteristic type meter.

How can this be accomplished?
A . Create a master PM and link to the characteristic on the Related Records tab.
B . Create a condition monitoring point and specify the PM on the upper or lower limit.
C . Create a PM against the asset and specify the meter on the Frequency tab of the P
E . Create an escalation based on the characteristic meter and trigger the PM via an action.

Answer: B

Explanation:

Reference: ftp://ftp.software.ibm.com/software/tivoli_support/misc/ STE/2012_08_23_STE_Preventive_Maintenance_and_Condition_Monitoring.pdf

Exit mobile version