How can the LEED AP relieve the owner’s concerns?

An owner has expressed concerns to the LEED AP about the costs associated with the integrative process.

How can the LEED AP relieve the owner’s concerns?
A . The LEED AP should explain to the owner that since the integrative process is not a prerequisite, it can be dropped from the project thus cutting back project costs
B . The LEED AP should explain that while the first costs and the design fees will be higher due to the integrative
process, the operational savings will make up for the extra costs
C . The LEED AP should explain that the integrative process can easily be postponed and reconsidered until after
the design for the construction phase, when it will most likely save costs for the project
D . The LEED AP should explain that the integrative process reduces costs by avoiding delays associated with design changes during the construction document phase and reducing change orders during construction

Answer: D

Explanation:

The integrative process is a strategy that can lead to both immediate and long-term cost savings. By engaging in early analysis of the interrelationships among systems, the project team can identify unique opportunities and challenges. This early engagement helps to optimize the design, which can reduce the time and cost associated with making design changes later in the project and minimize the need for change orders during construction1.

Reference: Understanding Integrative Design in LEEDv4 – BuildingGreen1.

LEED v4 for Interior Design and Construction (ID+C): Reference Guide2.

New LEED Integrative Process Credit Encourages Design-Build3.