Exam4Training

How can a ticket-based system slow down infrastructure provisioning and limit the ability to scale? Choose two correct answers.

How can a ticket-based system slow down infrastructure provisioning and limit the ability to scale? Choose two correct answers.
A . End-users have to request infrastructure changes
B . Ticket based systems generate a full audit trail of the request and fulfillment process
C . Users can access catalog of approved resources from drop down list in a request form
D . The more resources your organization needs, the more tickets your infrastructure team has to process

Answer: A

Explanation:

These are some of the ways that a ticket-based system can slow down infrastructure provisioning and

limit the ability to scale, as they introduce delays, bottlenecks, and manual interventions in the process of creating and modifying infrastructure.

Exit mobile version