GAQM CLSSGB-001 Certified Lean Six Sigma Green Belt (CLSSGB) Online Training
GAQM CLSSGB-001 Online Training
The questions for CLSSGB-001 were last updated at Nov 22,2024.
- Exam Code: CLSSGB-001
- Exam Name: Certified Lean Six Sigma Green Belt (CLSSGB)
- Certification Provider: GAQM
- Latest update: Nov 22,2024
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
- A . True
- B . False
The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.
- A . True
- B . False
Which statement(s) describe an undesirable situation when implementing SPC?
- A . The lower Control Limit for the R chart is equal to zero
- B . Attempt to use SPC for tracking transaction times at a warehouse
- C . A process is in Statistical Control before implementation of SPC
- D . The Control Limits are wider than the customer specification limits
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
- A . Individual―Moving Range
- B . Xbar-R Charts
- C . Xbar-S Charts
- D . nP and P Charts
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
- A . Moving Average Chart
- B . Multi-Vari Chart
- C . X bar Chart
- D . Pareto Chart
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
- A . Never, a Control Plan is a living document
- B . As soon as the Champion signs off
- C . Within 30 days of the LSS project review team meeting
- D . After the project has been presented at the recognition event
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
- A . Positively
- B . Not
- C . Negatively
- D . None
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
- A . Non-linear relationships between the inputs X’s and output Y
- B . Uncertainty in the slope of the linear relationship between an X and a Y
- C . Relationships between Y (output) and more than one X (Input)
- D . Preventing the use of a Designed Experiment if unnecessary
- E . We assume that the X’s are independent of each other
Fractional Factorial designs for an experimental approach are used when ____________ about the
multiple metric interaction in a process.
- A . Much is known
- B . Little is known
- C . We don’t care
- D . Data exists
A Belt will occasionally do a quick experiment referred to as an OFAT which stands for ____________________.
- A . Only a Few Are Tested
- B . Opposite Factors Affect Technique
- C . One Factor At a Time
- D . Ordinary Fractional Approach Technique