For a production version to be valid and consistent what requirements must be fulfilled?
Note: There are 3 correct answers to this question.
A . The lot size range must be within the lot-size range of the assigned routing.
B . The assigned routing must be a rate routing.
C . The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
D . The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
E . The assigned routing must NOT have alternative sequences.
Answer: A,C,D
Latest C_TS422_2020 Dumps Valid Version with 80 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund