During the VR service test, in order to maximize the downlink peak value of the cell, which of the following measures can be adopted?
A . Ensure the downlink LOS environment
B. Adjust the DMRS type of PDSCH to Type1
C. Adjust the time slot ratio from 8:2 to 7:3
D. Adjust the maximum number of downstream scheduled streams to 4 streams or higher
Answer: D