During a DMO procedure with SUM, after which phase is the repository first available on the target database? Please choose the correct answer.
A . Uptime migration (EU_CLONE_MIG_UT_RUN)
B . ParaUel distribution (PARDIST_SHD)
C . Downtime migration (EU_CLONE_MIG_DT_RUN)
D . Shadow repository creation (EU_IMPORT*)
Answer: A
Latest E_S4HCON2022 Dumps Valid Version with 54 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund