Which requirement is optional for a VxRail Stretched Cluster?
Which requirement is optional for a VxRail Stretched Cluster?A . Enterprise Plus vSphere LicensingB . External vCenterC . IPv6 Multicast between locationsD . Cross-site layer-2 connectivityView AnswerAnswer: B
What is the correct procedure to do this?
A company has chosen to deploy an external vCenter/PSC. They would like to use the bundled vCenter license that comes with VxRail. What is the correct procedure to do this?A . Contact EMC Licensing to have a replacement vCenter license generated.Next, license the newly created vCenter.Last, deploy VxRail with external...
Which integrated backup solution is included with VxRail at no additional cost?
Which integrated backup solution is included with VxRail at no additional cost? A. Dell EMC Data Protection Suite B. VMware vSphere Data Protection C. VMware VM Snapshots D. Dell EMC NetWorkerView AnswerAnswer: B Explanation: Is replication in vSphere Data Protection Advanced licensed separately? A. No. Replication of backup data is...
Which software is included with VxRail and provides continuous replication of virtual machines deployed on a VxRail appliance?
Which software is included with VxRail and provides continuous replication of virtual machines deployed on a VxRail appliance?A . VMware VM SnapshotsB . Dell EMC RecoverPoint for VMsC . VMware vSphereData ProtectionD . Dell EMC RecoverPoint CRRView AnswerAnswer: A
When preparing for a VxRail deployment, which components require forward and reserve DNS records?
When preparing for a VxRail deployment, which components require forward and reserve DNS records?A . ESXi hosts, vRealize Log Insight, and Platform Services ControllerB . Platform Services Controller. vCenter, and ESRS/VEC . ESXi hosts, vCenter, and vRealize OperationsD . ESXi Hosts, vCenter, and ESRS/VEView AnswerAnswer: A Explanation: Determine your time...
In a 24 node Stretched Cluster VxRail deployment, what is the acceptable Rout Trip Time (RTT) latency between sites?
In a 24 node Stretched Cluster VxRail deployment, what is the acceptable Rout Trip Time (RTT) latency between sites?A . Primary to witness site RTT latency: 10 msSecondary to witness site RTT latency: 10 msPrimary tosecondary site RTT latency: 10 msB . Primary to witness site RTT latency: 50 msSecondary...
Which method will collect all logs at once?
To investigate a problem on a VxRail system, the onsite engineer has to collect the complete set of logs. Which method will collect all logs at once?A . Download https://:443/appliance /support-bundleB . Export vCenter system logsC . Run/mystic/generateFullLogBundlecommand in VxRail Manager CLID . Click “Generate New Log Bundle” in the...
What is required to resolve this problem?
An ESRS deployment on a VxRail system with external vCenter fails with “Invalid target datastore specified”. What is required to resolve this problem?A . Open a Service Request to involve supportB . Retry deployment through the retry buttonC . Manually deploy ESRSD . Restart vCenter services and retry the deploymentView...
Where can the latest VxRail Pre-Installation Site Checklist be obtained for a new deployment?
Where can the latest VxRail Pre-Installation Site Checklist be obtained for a new deployment?A . Service offering indexB . VxRail Master Knowledge Base articleC . SolVeD . EMC Support VxRailView AnswerAnswer: D
Which step of the VxRail Initialization wizard may time out if the user does not proceed to the next step within 20 minutes?
Which step of the VxRail Initialization wizard may time out if the user does not proceed to the next step within 20 minutes?A . Build complete screenB . Review expected nodes listC . Review and validateD . Configuration of the VxRail Manager IP addressView AnswerAnswer: C