Which series of VxRail nodes supports either Intel or AMD processors and either hybrid or All-Flash storage?
Which series of VxRail nodes supports either Intel or AMD processors and either hybrid or All-Flash storage?A . G SeriesB . D SeriesC . E SeriesD . V SeriesView AnswerAnswer: A
What option should the engineer select in the VxRail Deployment Wizard to input the hostnames and IP addresses?
An implementation engineer is reviewing the customer requirements for a VxRail implementation. The customer has specified noncontiguous hostnames and IP addresses What option should the engineer select in the VxRail Deployment Wizard to input the hostnames and IP addresses?A . Autofill - with the correct incrementorB . AdvancedC . Autofill...
What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?
What is validated by running the Proactive VM Creation test in vCenter on a VxRail cluster?A . vSAN operates successfullyB . Network firewalls are configured correctlyC . vSAN has sufficient storage capacityD . Network performance is sufficientView AnswerAnswer: D
CORRECT TEXT
CORRECT TEXT A VxRail implementation engineer is validating the network environment with NVT. The proposed switch configuration is shown in the exhibit. The ToR Switch information file is available. Use the VxRail simulator to set up NVT for switch validation. Import the switch Information and tag the ports based on...
What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?
What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?A . Latency and bandwidth measurement to the witness hostB . Network configuration and performance for vSANC . Network performance for virtual machinesD . Latency measurement between DCs for Stretched ClustersView AnswerAnswer: A
What is a requirement for the vSAN Data-at-Rest Encryption?
What is a requirement for the vSAN Data-at-Rest Encryption?A . All-Flash or AII-NVMe VxRailB . VxRail with at least 3 nodesC . External Key Management ServerD . External customer provided vCenterView AnswerAnswer: C
What is a consideration when adding nodes to a VxRail G Series chassis?
What is a consideration when adding nodes to a VxRail G Series chassis?A . G560 and G410 nodes are permitted in the same chassisB . In a full G Series chassis, all nodes must have 10GbE portsC . Hybrid and All-Flash nodes are permitted, if in different chassisD . All...
An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?
An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?A . 5B . 10C . 20D . 25View AnswerAnswer: C
Which command is used to restart the Loudmouth process on an ESXi node?
Which command is used to restart the Loudmouth process on an ESXi node?A . /usr/IibAmiware/loudmouth/bin/loudmouthd restartB . systemcti restart loudmouthC . /etc/int.d/loudmouth restartD . systemcti restart vmware-loudmouthView AnswerAnswer: C
What is the protocol for recording the results'?
A VxRail Test Plan has been completed What is the protocol for recording the results'?A . With the implementation team, complete and document each test, test date, and a screenshot of resultsB . In front of a customer, complete each test and document the test dateC . With the implementation...