What is a consideration about the snapshot?
A script has been designed to create a snapshot using the following command: symsnapvx -sid <> -sg snapvx_sg establish -name secure_backup -secure -delta 3:23 -nop What is a consideration about the snapshot?A . Can be terminated using the -force flagB . Is permanent and cannot be terminatedC . Cannot be...
Which password is required for the upgrade?
A storage architect is planning a Unisphere upgrade. Which password is required for the upgrade?A . lockboxB . rootC . sysadminD . boxmgmtView AnswerAnswer: A
What is the correct order of steps the architect needs to take to complete the SRDF setup?
An architect is configuring BCSD to design SRDF/S between two new PowerMax arrays. The architect has completed the tasks for the local side of the solution, including RA Port Group, Replication Group, and site switch. What is the correct order of steps the architect needs to take to complete the...
What is the maximum IOPS the Storage Group can achieve in the event a switch port being used by one of the director ports fails but the director remains online?
A PowerMax Storage Group has Host I/O limits set at 10000 IOPS. The Port Group contains four ports across different directors. The Dynamic Distribution is set to OnFailure. What is the maximum IOPS the Storage Group can achieve in the event a switch port being used by one of the...
By what percentage is SRDF throughput improved by SiRT?
By what percentage is SRDF throughput improved by SiRT?A . 10%B . 20%C . 30%D . 40%View AnswerAnswer: B
What needs to be created in BCSD to link multiple SRDF/A sessions?
What needs to be created in BCSD to link multiple SRDF/A sessions?A . Composite GroupB . Logical relationshipC . Consistency GroupD . MSC logical relationshipView AnswerAnswer: C
What is the maximum number of BTP files that can be included in a project in Sizer?
What is the maximum number of BTP files that can be included in a project in Sizer?A . 40B . 30C . 10D . 20View AnswerAnswer: B
How much data can be filled in the Capture Delta Set in these 60 seconds?
An application workload is 20 MB/s and the Transmit Delta Set has 600 MB of data from the previous cycle. The cycle time for the current cycle will be 60 seconds. How much data can be filled in the Capture Delta Set in these 60 seconds?A . 600 MBB ....
What is the maximum number of Bricks and drives that can be configured in a VMAX 950?
What is the maximum number of Bricks and drives that can be configured in a VMAX 950?A . 2 Bricks and 100 drivesB . 8 Bricks and 288 drivesC . 2 Bricks and 96 drivesD . 8 Bricks and 1920 drivesView AnswerAnswer: B
What is the correct action to take?
At a disaster planning meeting, an architect is presented with the following facts by a client: A Unix host is replicating storage from a Production PowerMax to a VMAX 250FX. RDF pairs have been split with Production and DR hosts accessing their respective storage. Invalid tracks have started to build...