What is the difference between Compression only and Deduplication and compression on a VxRail vSAN cluster?
- A . Compression only: A failed capacity disk causes the disk group to go offline
Deduplication and compression: A failed capacity disk does not impact the entire disk group - B . Compression only: Does not require a rolling reformat of the disks when enabled
Deduplication and compression: Requires a rolling reformat of the disks when enabled - C . Compression only: Added capacity disk requires a disk group rebuild
Deduplication and compression: Added capacity disk does not require a disk group rebuild - D . Compression only: A failed capacity disk does not impact the entire disk group
Deduplication and compression: A failed capacity disk causes the disk group to go offline
What is required to enable vSAN encryption on a VxRail cluster?
- A . All-Flash system
External Key Management Server - B . Internal vCenter Server
Internal Key Management Server - C . External vCenter Server
External Key Management Server - D . Internal vCenter Server
External Key Management Server
Which license is required for vSAN Data-At-Rest Encryption, and what is characteristic of this type of encryption?
- A . Requires vSAN Enterprise Plus
Applies to the entire datastore - B . Requires vSAN Standard
Applies on a per VM basis - C . Requires vSAN Advanced
Applies on a per VM basis - D . Requires vSAN Enterprise
Applies to the entire datastore
In a 24 node Stretched Cluster VxRail deployment, what is the acceptable Rout Trip Time (RTT) latency between sites?
- A . Primary to witness site RTT latency: 10 ms
Secondary to witness site RTT latency: 10 ms
Primary to secondary site RTT latency: 10 ms - B . Primary to witness site RTT latency: 50 ms
Secondary to witness site RTT latency: 50 ms
Primary to secondary site RTT latency: 6 ms - C . Primary to witness site RTT latency: 75 ms
Secondary to witness site RTT latency: 75 ms
Primary to secondary site RTT latency: 1 ms - D . Primary to witness site RTT latency: 75 ms
Secondary to witness site RTT latency: 150 ms
Primary to secondary site RTT latency: 5 ms
What is the maximum number of supported nodes in a VxRail Stretch Cluster?
- A . 16
- B . 32
- C . 64
- D . 30
VxRail Validation is failing for a deployment engineer during initialization. The error states that Node 1 cannot reach Node 2 on the Management network. While investigating the issue, the deployment engineer is unable to ping the management network default gateway.
Which step in the VxRail Configuration Portal should have been followed to prevent the situation?
- A . The Pre-Deployment Checklist should have been reviewed and issues resolved.
- B . The cluster should have been configured with two virtual distributed switches.
- C . The VxRail Manager and vCenter server must be logically separated on different subnets.
- D . The NIC Configuration must be set to 4x25GbE to support the network devices.
A company is planning to deploy their Virtual Desktop Infrastructure on VxRail. The solution should support 2D and 3D high end visualization.
Which VxRail license is required for this solution?
- A . vSphere Enterprise Plus
- B . vSphere with Operations Management Enterprise
- C . vSphere Enterprise
- D . vSphere Standard
A company has multiple VxRail systems installed at geographically dispersed data centers They want to upgrade all their VxRail systems to the latest release- Before the upgrade, they want an inventory report of all the VxRail systems which shows the current health status and versions of all installed VxRail components.
What should be used to meet these requirements?
- A . itrend
Live Optics - B . VxRail Plugin for vCenter Server
VxRail API - C . VxRail Plugin for vCenter Server
DRM Services - D . Mitrend
VxRail Log insight
A VxRail Test Plan has been completed.
What is the protocol for recording the results?
- A . With the implementation team, complete and document each test, test date, and a screenshot of results
- B . In front of a customer, complete each test and document the test date
- C . With the implementation team, complete each test and document the test date
- D . In front of a customer, complete and document each test, test date, and a screenshot of results
A VxRail is being deployed with the external vCenter Server.
What is a consideration with the VxRail Management account?
- A . Must be a local user
- B . Cannot be a new user
- C . Must not be part of the SSO domain
- D . Must be assigned the VMware HCIA Management role