DELL EMC D-VXR-DY-23 Dell Technologies VxRail Deploy 2023 Online Training
DELL EMC D-VXR-DY-23 Online Training
The questions for D-VXR-DY-23 were last updated at Jan 30,2025.
- Exam Code: D-VXR-DY-23
- Exam Name: Dell Technologies VxRail Deploy 2023
- Certification Provider: DELL EMC
- Latest update: Jan 30,2025
Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?
- A . PCIe network card must be added to all nodes
- B . Node requires only the same drive configuration
- C . Node hardware must be identical to the other three nodes
- D . New node must be at the same VxRail version as existing nodes
An implementation engineer is tasked with expanding an 8-node VxRail E560 cluster with an S570 node. The cluster has been configured with 1 GbE networking.
Which two should be considered when planning to expand the cluster? (Select 2)
- A . Node limit has been reached on the cluster
- B . AMD and Intel based nodes cannot be mixed
- C . E Series nodes require more capacity before expansion
- D . All nodes in the cluster must be the identical series
What are the requirements for a customer-supplied VDS in a VxRail deployment?
- A . 4 or 8 uplinks
Port groups for Discovery, Management, vMotion, and vSAN only - B . 2 or 4 uplinks
Port groups for Discovery, Management, vMotion, and vSAN only - C . 2 or 4 uplinks
Port groups for Discovery, Management vCenter Server, vMotion, and vSAN - D . 4 or 8 uplinks
Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN
A VxRail cluster has just been deployed. The administrator notices that Deduplication and Compression are not enabled.
What is the reason for this issue?
- A . The VSAN licensing is missing
- B . The service is disabled by default
- C . Nodes are configured with hybrid drives
- D . Nodes are configured with a single disk group
You are validating that a network environment is ready for a 4 node VxRail Model V570F deployment.
What types of DNS records must be created for VxRail components before implementation can begin?
- A . Forward (A) records only
- B . Forward (A) records and Reverse (PTR) records
- C . Forward (A) and MX records
- D . NS records and Reverse (PTR) records
View the Exhibit.
You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?
- A . Top of Rack (ToR) switches will use two uplink ports
- B . Upstream switches will have two ISLs
- C . Two Top of Rack (ToR) switches will be used
- D . Two Upstream switches will be used
Which vSAN feature requires an All-Flash cluster?
- A . Data-at-Rest Encryption
- B . Storage Policy Based Management
- C . Data-in-Transit Encryption
- D . Deduplication and compression
What is a requirement for the Top of Rack (ToR) switches used in a VxRail implementation?
- A . MLD Querier
- B . EtherChannel
- C . IPV4 and IPV6 Multicast
- D . LACP
What is used to control remote access to VxRail through SRS?
- A . VxRail Manager
- B . SRS VE Gateway
- C . vCenter
- D . Policy Manager
What is the recommended way to power up VxRail E, V, P, and S Series nodes?
- A . Ensure the System Health indicator blinks amber for 10 minutes after power on
- B . Use the power button on the rear panel to power on each node
- C . Wait at least 30 seconds between powering up each node
- D . Use the iDRAC interface to power on each node