DELL EMC D-PSC-MN-01 Dell PowerScale Maintenance Online Training
DELL EMC D-PSC-MN-01 Online Training
The questions for D-PSC-MN-01 were last updated at Nov 08,2024.
- Exam Code: D-PSC-MN-01
- Exam Name: Dell PowerScale Maintenance
- Certification Provider: DELL EMC
- Latest update: Nov 08,2024
After a node is serviced and ready for operation, which steps are crucial to reintegrate it into the cluster? (Select two)
- A . Synchronizing the node’s clock with the cluster
- B . Ensuring the node’s firmware is up to date
- C . Configuring the node’s network settings
- D . Assigning the node to the correct IP pool
An organization plans to add H600 nodes to a Dell PowerScale cluster. The machine room is only equipped with 120V power supplies.
What is a consideration for the platform engineer?
- A . In this environment, each chassis can accommodate only two nodes.
- B . H600 nodes can operate normally in this environment.
- C . Additional space is required for transformers in this environment.
- D . Generation 6 PowerScale nodes require high-line power.
In the context of adding a node to a PowerScale cluster, what is the purpose of smartfailing?
- A . It allows the node to join the cluster without disrupting existing operations.
- B . It tests the node’s compatibility with the cluster environment.
- C . It provides a mechanism for graceful removal of a node.
- D . It ensures data is evenly distributed across the cluster.
Which tools are indispensable for maintaining compliance within a PowerScale cluster? (Select two)
- A . File system auditing tools
- B . Configuration management databases
- C . Automated policy enforcement engines
- D . Network traffic analyzers
What are the steps required before replacing an FRU node component?
- A . Create a service request with Dell Support, gather logs, obtain replacement part then install
- B . Run the isi_healthcheck command, confirm service tag, remove node cabling, extend node
- C . Set-up workspace with ESD mat, confirm service tag, SSH into different node, run the isi healthcheck command
- D . SmartFail node, gather logs, shut the node down
What does the process of smartfailing a node involve?
- A . Temporarily removing the node from service
- B . Physically replacing the node hardware
- C . Transferring data to other nodes in the cluster
- D . Updating the cluster configuration database
A Dell PowerScale customer accidentally initiates a SmartFail on a node.
Which command can they use to stop the SmartFail process?
- A . isi node smartfail -revert
- B . isi devices node stopfail
- C . isi device smartfail –node-lnn -stop
- D . isi cluster smartresume -node
What are the essential phases in the PowerScale installation process?
- A . Planning and sizing
- B . Networking and configuration
- C . Data migration
- D . Validation and testing
What is a critical aspect of external networking setup for PowerScale clusters?
- A . Configuring VLANs
- B . Ensuring compatibility with legacy systems
- C . Implementing Quality of Service (QoS)
- D . Establishing redundant connections
What type of NIC is used for the external network on a Dell PowerScale F200 node?
- A . Dual port 10/25 GbE or dual port 40/100 GbE
- B . Single port 10 GbE or dual port 25/40 GbE
- C . Dual port 10/40 GbE or single port 100GbE
- D . Dual port 10/100 GbE